What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £27.85 |
| 2 | Peterhead Block 1 | £20.57 |
| 3 | Seabank Module 2 | £20.57 |
| 4 | SOUTH HUMBER BANK P/S | £20.17 |
| 5 | GridBeyond L0DN | £15.71 |
| 6 | Carrington Ltd - 1 | £10.88 |
| 7 | Carrington Ltd - 2 | £10.07 |
| Region | £/MWh |
|---|---|
| South Eastern | £4.5 |
| Eastern | £4.5 |