What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £22.38 |
| 2 | Cottam Development Centre | £22.35 |
| 3 | Staythorpe 3 | £22.10 |
| 4 | Grain | £16.80 |
| 5 | Lakeside | £11.00 |
| 6 | Native River | £9.88 |
| 7 | Ocker Hill | £9.64 |
| Region | £/MWh |
|---|---|
| South Western | £9.9 |
| Midlands | £9.1 |
| South Wales | £9.0 |
| Yorkshire | £7.7 |
| South Eastern | £7.6 |
| Merseyside and North Wales | £4.9 |
| Eastern | £3.8 |