What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Foyers | £10.43 |
| 2 | Unit 2 | £9.59 |
| 3 | Unit 1 | £7.75 |
| 4 | Sloy G2 | £7.37 |
| 5 | Sloy G3 | £7.37 |
| 6 | Limejump Energy #04 | £7.27 |
| 7 | Limejump Energy #03 | £6.54 |
| Region | £/MWh |
|---|---|
| South Eastern | £5.5 |
| Yorkshire | £5.3 |
| Eastern | £4.8 |