What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £16.15 |
| 2 | Port of Tyne | £12.25 |
| 3 | F & S Energy #01 | £11.96 |
| 4 | Bloxwich | £11.75 |
| 5 | Pembroke 11 | £9.00 |
| 6 | Centrica Business Solutions S06B | £7.53 |
| 7 | Pillswood 1 | £7.37 |