What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £18.45 |
| 2 | Grain | £15.82 |
| 3 | Unit 2 | £14.25 |
| 4 | Carrington Ltd - 2 | £13.88 |
| 5 | Little Raith | £13.79 |
| 6 | Ilmer Lane | £13.18 |
| 7 | Thame Road | £13.18 |
| Region | £/MWh |
|---|---|
| South Scotland | £13.8 |
| North Western | £12.8 |
| Eastern | £12.7 |
| South Eastern | £12.7 |
| Midlands | £12.7 |
| Southern | £12.3 |
| Northern | £11.9 |