What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 2 | £26.35 |
| 2 | SOUTH HUMBER BANK P/S | £17.95 |
| 3 | Marchwood | £15.67 |
| 4 | Coryton | £11.64 |
| 5 | Lakeside | £11.00 |
| 6 | Port of Tyne | £10.13 |
| 7 | SSE Energy Supply #01 | £5.79 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.0 |
| Northern | £10.1 |
| North Western | £3.3 |
| Eastern | £2.5 |