What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £39.63 |
| 2 | SOUTH HUMBER BANK P/S | £30.50 |
| 3 | Damhead Creek | £24.54 |
| 4 | Seabank Module | £21.53 |
| 5 | Shoreham | £18.52 |
| 6 | Rocksavage | £16.87 |
| 7 | Carrington Ltd - 2 | £13.93 |
| Region | £/MWh |
|---|---|
| Eastern | £10.1 |
| Yorkshire | £7.4 |
| Midlands | £7.1 |
| Northern | £7.1 |
| South Wales | £7.1 |