What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Kings Lynn A | £34.13 |
| 2 | Didcot B main 6 | £32.75 |
| 3 | Keadby-2 Main | £27.76 |
| 4 | KGL 1 | £26.00 |
| 5 | Unit 3 | £24.07 |
| 6 | Grain | £23.96 |
| 7 | Cottam Development Centre | £23.95 |
| Region | £/MWh |
|---|---|
| Eastern | £23.1 |
| Northern | £22.0 |
| Merseyside and North Wales | £21.4 |
| Midlands | £21.1 |
| Southern | £19.8 |
| South Eastern | £18.6 |