What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pivot Kemsley | £18.94 |
| 2 | Wormald Green | £13.19 |
| 3 | Dollymans | £13.06 |
| 4 | Hunningley Stairfoot | £13.04 |
| 5 | F & S Energy #01 | £13.00 |
| 6 | Port of Tyne | £12.98 |
| 7 | Bloxwich | £12.96 |
| Region | £/MWh |
|---|---|
| Yorkshire | £13.0 |
| Northern | £12.5 |
| North Western | £12.3 |
| Eastern | £12.1 |
| South Wales | £11.1 |
| Merseyside and North Wales | £10.9 |
| Midlands | £10.1 |
| South Eastern | £9.0 |
| South Western | £8.6 |