What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £404.01 |
| 2 | Immingham CHP | £400.28 |
| 3 | Keadby-2 Main | £382.97 |
| 4 | Coryton | £367.34 |
| 5 | Lakeside | £348.27 |
| 6 | Unit 1 | £330.88 |
| 7 | Pivot Kemsley | £314.54 |
| Region | £/MWh |
|---|---|
| South Eastern | £296.5 |
| Yorkshire | £219.7 |
| North Western | £150.1 |
| Northern | £140.2 |
| Merseyside and North Wales | £93.4 |
| Eastern | £70.4 |
| Midlands | £62.8 |
| South Western | £41.5 |