What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Spalding | £207.79 |
| 2 | Pivot Kemsley | £199.28 |
| 3 | Keadby-2 Main | £149.00 |
| 4 | Limejump Energy #04 | £145.88 |
| 5 | Marchwood | £145.44 |
| 6 | Dollymans | £136.65 |
| 7 | Wormald Green | £118.91 |
| Region | £/MWh |
|---|---|
| South Eastern | £199.3 |
| Eastern | £136.7 |
| Northern | £118.9 |
| North Western | £117.8 |
| Southern | £24.2 |