What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Kings Lynn A | £22.88 |
| 2 | Peterhead Block 1 | £21.10 |
| 3 | Dollymans | £15.16 |
| 4 | Unit 2 | £13.67 |
| 5 | Port of Tyne | £11.80 |
| 6 | Burwell Weirs Drove | £11.75 |
| 7 | Roosecote | £11.70 |
| Region | £/MWh |
|---|---|
| Eastern | £14.7 |
| South Scotland | £11.5 |
| North Western | £10.7 |
| Northern | £10.5 |
| Yorkshire | £3.7 |