What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £0.82 |
| 2 | GridBeyond L0DN | £0.51 |
| 3 | Brigg | £0.39 |
| 4 | Glendoe 1 | £0.28 |
| 5 | Spalding | £0.27 |
| 6 | Brigg DG | £0.21 |
| Region | £/MWh |
|---|---|
| Yorkshire | £0.4 |