What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £17.21 |
| 2 | Monk Fryston | £17.18 |
| 3 | THURROCK STORAGE #3 | £16.75 |
| 4 | Immingham CHP | £16.16 |
| 5 | SUNDON | £16.13 |
| 6 | UKPR MANW | £16.08 |
| 7 | UK Power Reserve #08 | £16.08 |
| Region | £/MWh |
|---|---|
| Yorkshire | £17.2 |
| South Eastern | £16.1 |
| Midlands | £14.5 |