What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £13.57 |
| 2 | Cowley | £13.12 |
| 3 | SUNDON | £13.05 |
| 4 | Pivot Coventry | £12.23 |
| 5 | Brook Farm | £12.20 |
| 6 | Burwell 1 | £12.20 |
| 7 | Brentwood | £12.17 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.1 |
| South Western | £11.4 |
| Midlands | £11.1 |
| Eastern | £9.8 |