What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Aggregate South England 3 | £23.49 |
| 2 | BMUid for Sutton Bridge | £21.51 |
| 3 | Grain | £21.30 |
| 4 | Enfield Centre Ltd BMU1 | £21.30 |
| 5 | Bulphan Fen | £21.22 |
| 6 | Staythorpe 3 | £20.46 |
| 7 | Larks Green | £20.22 |
| Region | £/MWh |
|---|---|
| Eastern | £21.2 |
| South Western | £20.2 |
| Midlands | £20.2 |