What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 81 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate S E Eng 02 | £22.66 |
| 2 | UKPR S East | £19.58 |
| 3 | UKPR MANW | £19.48 |
| 4 | Pembroke 51 | £19.09 |
| 5 | EDF Aggregate South England 3 | £18.98 |
| 6 | UKPR East Mids | £18.71 |
| 7 | BMUid for Sutton Bridge | £18.66 |
| Region | £/MWh |
|---|---|
| Eastern | £18.0 |