What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £44.97 |
| 2 | Zenobe Capenhurst #3 | £21.50 |
| 3 | GridBeyond L0DN | £19.71 |
| 4 | Berkeley | £16.75 |
| 5 | Pivot Coventry | £14.83 |
| 6 | Kilmarnock South | £14.75 |
| 7 | SUNDON | £14.66 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £21.5 |
| South Scotland | £14.7 |
| Midlands | £14.7 |
| East Midlands | £14.0 |
| Yorkshire | £12.7 |