What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 68 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | West Burton B | £65.45 |
| 2 | GridBeyond L0EN | £62.12 |
| 3 | Ferrybridge-1 | £24.89 |
| Region | £/MWh |
|---|---|
| East Midlands | £65.5 |
| Yorkshire | £24.9 |