What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 77 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £47.80 |
| 2 | GridBeyond L0DN | £26.29 |
| 3 | West Burton B | £15.44 |
| 4 | Broadditch | £15.33 |
| 5 | ClayTye Farm 1 | £14.93 |
| Region | £/MWh |
|---|---|
| East Midlands | £15.4 |
| South Eastern | £15.3 |
| Eastern | £14.9 |