What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 52 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £113.41 |
| 2 | GridBeyond L0DN | £60.16 |
| 3 | Carnegie Road 1 | £55.51 |
| 4 | Centrica Business Solutions S05L | £45.45 |
| 5 | Ferrybridge-1 | £44.88 |
| 6 | Sloy G4 | £33.55 |
| 7 | Glendoe 1 | £33.54 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £55.5 |
| Yorkshire | £44.9 |