What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £15.00 |
| 2 | UKPR MANW | £11.53 |
| 3 | UK Power Reserve #08 | £11.53 |
| 4 | UKPR East Mids | £11.53 |
| 5 | Cottam Development Centre | £9.40 |
| 6 | Grain | £9.20 |
| 7 | Pillswood 1 | £5.95 |