What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-1 | £6.14 |
| 2 | Ferrybridge-2 | £5.11 |
| 3 | Cottam Development Centre | £4.97 |
| 4 | Limejump Energy #05 | £3.47 |
| Region | £/MWh |
|---|---|
| Yorkshire | £5.8 |