What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £39.61 |
| 2 | GridBeyond L0DN | £17.01 |
| 3 | Hutton | £16.38 |
| 4 | Carrington Ltd - 2 | £12.79 |
| 5 | Dinorwig | £9.97 |
| 6 | Ffestiniog | £6.70 |
| 7 | Cottam Development Centre | £6.18 |