What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 52 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £1.28 |
| 2 | Fasnakyle G1 | £1.00 |
| 3 | Buxton | £0.83 |
| 4 | GridBeyond L0DN | £0.68 |
| 5 | Carrington Ltd - 2 | £0.55 |
| 6 | SSE Energy Supply #01 | £0.50 |
| 7 | Wishaw | £0.49 |
| Region | £/MWh |
|---|---|
| South Scotland | £0.5 |
| Yorkshire | £0.5 |
| North Western | £0.5 |