What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £47.56 |
| 2 | GridBeyond L0DN | £11.18 |
| 3 | Carrington Ltd - 2 | £11.18 |
| 4 | Brigg | £2.08 |
| 5 | SSE Energy Supply #01 | £0.75 |
| 6 | Ferrybridge-1 | £0.75 |
| 7 | Ferrybridge-2 | £0.75 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1.1 |