What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 51 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £48.78 |
| 2 | GridBeyond L0DN | £12.82 |
| 3 | Carrington Ltd - 2 | £12.82 |
| 4 | Dinorwig | £7.98 |
| 5 | Holes Bay | £5.64 |
| Region | £/MWh |
|---|---|
| Southern | £5.6 |