What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 61 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £83.71 |
| 2 | Finlarig | £47.27 |
| 3 | Glendoe 1 | £47.23 |
| 4 | Brigg | £47.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £47.0 |