What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 59 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £21.12 |
| 2 | Pembroke 11 | £17.80 |
| 3 | Dong Severn Ut 20 | £13.94 |
| 4 | CathkinBattery | £6.46 |
| 5 | Carrington Ltd - 2 | £6.25 |
| 6 | Capenhurst | £5.92 |
| 7 | BGI Trading #01 | £4.73 |
| Region | £/MWh |
|---|---|
| South Scotland | £6.5 |
| Merseyside and North Wales | £5.9 |
| Eastern | £4.2 |