What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 102 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £43.33 |
| 2 | Dong Severn Ut 20 | £31.88 |
| 3 | Port of Tyne | £23.27 |
| 4 | Tebworth Park | £23.27 |
| 5 | Broadditch | £22.65 |
| 6 | GridBeyond L0DN | £22.22 |
| 7 | Finlarig | £22.22 |
| Region | £/MWh |
|---|---|
| Northern | £23.3 |
| Eastern | £23.3 |
| South Eastern | £22.6 |