What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £19.48 |
| 2 | Unit 2 | £14.03 |
| 3 | Cottam Development Centre | £8.12 |
| 4 | Carrington Ltd - 2 | £5.85 |
| 5 | Statkraft Markets #09 | £5.12 |
| 6 | SSE Energy Supply #01 | £4.79 |
| 7 | Ferrybridge-1 | £4.79 |
| Region | £/MWh |
|---|---|
| Yorkshire | £4.8 |