What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £62.88 |
| 2 | Ilmer Lane | £25.02 |
| 3 | Unit 1 | £24.54 |
| 4 | Unit 3 | £24.29 |
| 5 | GridBeyond L0DN | £23.06 |
| 6 | Kilmarnock South | £21.24 |
| 7 | Sloy G4 | £18.08 |
| Region | £/MWh |
|---|---|
| Eastern | £25.0 |
| South Scotland | £21.2 |