What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £61.00 |
| 2 | GridBeyond L0EN | £45.33 |
| 3 | GridBeyond L0DN | £20.20 |
| 4 | BMUid for Sutton Bridge | £18.31 |
| 5 | Spalding | £17.05 |
| 6 | West Burton B | £13.71 |
| 7 | SOUTH HUMBER BANK P/S | £12.66 |
| Region | £/MWh |
|---|---|
| East Midlands | £13.7 |
| Southern | £5.7 |
| South Western | £2.2 |