What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £21.89 |
| 2 | Thame Road | £12.32 |
| 3 | Glendoe 1 | £9.64 |
| Region | £/MWh |
|---|---|
| Eastern | £12.3 |