What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 64 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Connah's Quay | £37.40 |
| 2 | Didcot B main 5 | £37.13 |
| 3 | Holes Bay | £18.97 |
| 4 | Spalding | £16.06 |
| 5 | Flexitricity #03 | £13.68 |
| 6 | KGL 1 | £11.67 |
| 7 | Centrica Business Solutions S06B | £5.33 |
| Region | £/MWh |
|---|---|
| Southern | £19.0 |