What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 61 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £170.03 |
| 2 | Peterhead Block 1 | £168.43 |
| 3 | GridBeyond L0DN | £168.41 |
| 4 | GridBeyond L0EN | £168.41 |
| 5 | Ffestiniog | £161.99 |
| 6 | Coryton | £156.98 |
| 7 | Clachan G1 | £156.29 |