What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 51 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £75.01 |
| 2 | Peterhead Block 1 | £74.10 |
| 3 | GridBeyond L0DN | £74.10 |
| 4 | GridBeyond L0EN | £74.10 |
| 5 | Fasnakyle G3 | £69.69 |
| 6 | Centrica Business Solutions S05L | £69.57 |
| 7 | Ffestiniog | £69.57 |