What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Contego | £24.51 |
| 2 | Brigg | £24.49 |
| 3 | Centrica Business Solutions S05L | £24.49 |
| 4 | Carrington Ltd - 1 | £19.72 |
| Region | £/MWh |
|---|---|
| South Eastern | £24.5 |
| Yorkshire | £24.5 |