What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module | £319.44 |
| 2 | Monk Fryston | £212.71 |
| 3 | Ferrybridge-2 | £212.59 |
| 4 | Contego | £205.00 |
| 5 | Ocker Hill | £198.67 |
| 6 | Glendevon | £197.09 |
| 7 | Statkraft Markets #02 | £182.41 |
| Region | £/MWh |
|---|---|
| Yorkshire | £212.6 |
| South Eastern | £205.0 |
| Midlands | £198.7 |