What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Optimo Energy T01N | £70.58 |
| 2 | Pillswood 2 | £10.24 |
| 3 | Pillswood 1 | £10.24 |
| 4 | Wormald Green | £8.86 |
| 5 | Lakeside | £8.53 |
| 6 | Hawthorn Pit | £7.67 |
| 7 | Richborough Park 2 | £7.44 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.7 |
| Northern | £8.3 |
| South Eastern | £7.4 |