What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 111 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £37.60 |
| 2 | Limejump Energy #02 | £37.07 |
| 3 | Limejump Energy #02 | £36.89 |
| 4 | Limejump Energy #03 | £34.85 |
| 5 | Hutton | £33.38 |
| 6 | Limejump Energy #01 | £32.25 |
| Region | £/MWh |
|---|---|
| Eastern | £33.4 |