What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 76 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR East Mids | £11.00 |
| 2 | Immingham | £10.50 |
| 3 | UKPR MANW | £10.50 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.5 |