What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £139.49 |
| 2 | Blackpool | £133.03 |
| 3 | Pillswood 2 | £132.53 |
| 4 | Rocksavage | £124.71 |
| Region | £/MWh |
|---|---|
| Yorkshire | £132.5 |