What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 2 | £6.36 |
| 2 | SSE Energy Supply #01 | £6.20 |
| 3 | Tebworth Park | £5.67 |
| 4 | F & S Energy #03 | £5.55 |
| Region | £/MWh |
|---|---|
| Eastern | £5.7 |