What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 82 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £111.12 |
| 2 | Pembroke 11 | £106.62 |
| 3 | Pembroke 21 | £106.62 |
| 4 | Pembroke 31 | £106.62 |
| 5 | Pembroke 41 | £106.62 |
| 6 | Staythorpe 1 | £106.62 |
| 7 | Staythorpe 3 | £106.62 |
| Region | £/MWh |
|---|---|
| South Eastern | £77.4 |