What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 103 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-2 | £4.58 |
| 2 | GridBeyond L0DN | £4.53 |
| 3 | GridBeyond L0EN | £4.53 |
| 4 | Ferrybridge-1 | £4.26 |
| 5 | Gipsy Lane | £4.00 |
| Region | £/MWh |
|---|---|
| North Western | £4.0 |