What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Fasnakyle G2 | £50.83 |
| 2 | Keadby-2 Main | £43.03 |
| 3 | Hutton | £36.76 |
| 4 | Centrica Business Solutions S05L | £35.00 |
| 5 | GridBeyond L0DN | £31.29 |
| 6 | GridBeyond L0EN | £31.29 |
| 7 | Flexitricity #01 | £29.24 |
| Region | £/MWh |
|---|---|
| Eastern | £36.8 |
| South Western | £28.5 |