What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 1 | £15.19 |
| 2 | GridBeyond L0DN | £13.48 |
| 3 | GridBeyond L0EN | £13.48 |
| 4 | Jamesfield 2 | £11.73 |
| 5 | ZENOBE BLACKHILLOCK #2 | £6.21 |
| 6 | Kilmarnock South | £5.60 |
| 7 | Farnham | £5.46 |
| Region | £/MWh |
|---|---|
| North Scotland | £9.0 |
| South Scotland | £5.6 |
| Southern | £4.3 |