What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £3.00 |
| 2 | ClayTye Farm 2 | £2.59 |
| 3 | ClayTye Farm 1 | £2.58 |
| 4 | GridBeyond L0DN | £2.53 |
| 5 | GridBeyond L0EN | £2.53 |
| 6 | Broadditch | £2.40 |
| Region | £/MWh |
|---|---|
| Eastern | £2.6 |
| South Eastern | £2.4 |