What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR MANW | £280.86 |
| 2 | UKPR S East | £261.86 |
| 3 | UKPR East Mids | £221.48 |
| 4 | Newton wood | £171.00 |
| 5 | UK Power Reserve #08 | £102.71 |
| 6 | Brentwood | £87.27 |
| 7 | EDFE Aggregate N Scot 1 | £8.88 |
| Region | £/MWh |
|---|---|
| East Midlands | £171.0 |
| Eastern | £87.3 |
| South Scotland | £0.0 |